
Resume Arab standard terms. Your offer letter has the final terms — read it before you sign.
Urgently required for a leading company on the OXY Mukhaizna electrical and instrumentation oil and gas project in Oman: 2 Electrical Foremen for commissioning, with a diploma in electrical engineering, supervisory and pre-commissioning experience, and knowledge of LV, MCCs, VFDs and PTW. Salary not stated in the circular. Apply on Resume Arab.
Short answer: 2 Electrical Foremen – Commissioning are needed for the OXY Mukhaizna electrical and instrumentation project in Oman. You need a diploma in electrical engineering, supervisory experience, pre-commissioning and commissioning work, and knowledge of LV systems, MCCs, VFDs and PTW. Indian candidates only; salary is not in the circular. Apply here after you build a free Gulf CV.
A commissioning foreman sits between the engineers and the field crew. Engineers write the test sheets; the foreman makes sure the crew does each test safely, in the right order, and records the result. On a large oil field, a missed test can stop a well from starting, so recruiters look for foremen who can show a clean, documented track record.
| Detail | Information |
|---|---|
| Position | Electrical Foreman – Commissioning |
| Openings | 2 |
| Project | OXY Mukhaizna E&I, oil and gas |
| Location | Mukhaizna, Oman |
| Qualification | Diploma in Electrical Engineering |
| Key skills | Pre-commissioning, commissioning, LV, MCC, VFD, PTW |
| Salary | Not stated — confirm in the offer letter |
| Contract | Full-time, 2 years |
| Nationality | Indian candidates only |
From the circular:
| Stage | What happens | Typical records |
|---|---|---|
| Mechanical completion | Equipment installed and cabled | Installation checklists |
| Pre-commissioning | Equipment tested while dead | IR test sheets, continuity, termination checks |
| Commissioning | Equipment energised and run | Energisation permits, VFD parameter sheets, motor run tests |
| Handover | System given to operations | Signed test packs, punch list closed |
A foreman who can talk through this table with examples from real projects will do well in the interview.
Build it free in our Gulf CV builder, then check it with the CV score tool.
Updated CV, passport-size photo, passport copy, educational certificates, experience certificates and technical certificates. Keep scans clear and named properly.
More practice: interview questions tool.
Standard Gulf steps: GCC medical via Wafid; work visa under the Oman Ministry of Labour; resident card from the Royal Oman Police after arrival; emigration clearance on eMigrate for ECR passports. Track it all in our visa checklist.
No salary is stated. In the offer, look for basic pay, allowances, food, accommodation, transport, rotation and overtime. Compare with the salary tool and convert OMR with the currency tool.
See the "Standard benefits" box on this page — accommodation, medical, ticket, resident card, 2-year contract and paid annual leave under Oman labour law. The offer letter has the final terms.
Applying on Resume Arab is free. Do not pay for a "confirmed visa". Give your original passport only to a verified licensed agent with a receipt.
On the same project: Electrical Supervisor, Senior Electrical Technician – Commissioning, Senior Electrical Technician – LV and HV Electrical Technician. See the Electrician jobs guide and all vacancies.
| Document | Why it matters |
|---|---|
| ITR (Inspection & Test Record) | Proof that each test was done and passed |
| Punch list (A/B/C) | Open items; "A" items block energisation |
| Energisation certificate | Formal permission to apply power |
| Loop check sheets | Joint electrical and instrument checks |
| Handover dossier | Everything the operations team needs to take over |
A foreman who keeps these documents clean saves the project weeks at handover. In the interview, mention how you organised test packs and who signed them.
On an E&I project, electrical and instrument crews share many systems: motor-operated valves, VFD-driven pumps with process interlocks, and fire and gas panels. Most delays at commissioning come from these interfaces — a motor runs, but the interlock from the instrument loop is not ready. Good foremen agree a joint sequence with the instrument foreman every morning and walk the critical loops together.
Commissioning foremen often move up to commissioning supervisor, electrical commissioning lead or, with further study, commissioning engineer. Each project you complete adds to your record — keep a list of systems you energised and handed over, with dates, for your next CV.
Energising new equipment is one of the highest-risk moments on any project. Interviewers want to hear that you never rely on memory. A strong answer covers: confirming all "A" punch items are closed, checking the energisation certificate is signed, removing temporary earths, clearing the area, announcing the switching over radio, and having a second competent person present. Mention arc-flash PPE and the use of a voltage detector before and after switching. If you have ever stopped an energisation because something was not ready, say so — it shows the judgement a foreman needs.
A diploma in electrical engineering with supervisory experience.
Yes. The circular asks for pre-commissioning and commissioning experience.
LV distribution, MCCs, VFDs and the permit-to-work process.
Not stated in the circular. It will be in the offer letter.
Use the "Apply via Resume Arab" form on this page. Build your free CV first and get job alerts in the Resume Arab app.
CV shortlisting. Shortlisted candidates are contacted on WhatsApp. Open until 31 Dec 2026.
Free to build, ready in minutes, made for Gulf employers.
Build my free Gulf CV Download the Resume Arab appSee all Gulf jobs